SIGNIFICANT FACTORS AFFECTING CIVIL ENGINEERING PROJECT PERFORMANCE
Abstract
Keywords
Full Text:
PDFReferences
Adnan, H., Hashim, N., Mohd, N., Yusuwan, & Ahmad, N. (2012). Ethical Issues in the Construction Industry: Contractor’s Perspective. Procedia - Social and Behavioral Sciences, 35(December 2011), 719–727.
https://doi.org/10.1016/j.sbspro.2012.02.142
Al-Momani, A. H. (2000). Construction delay: a quantitative analysis. International Journal of Project Management, 18(1), 51–59. https://doi.org/10.1016/S0263-7863(98)00060-X
Ali, N. A. N. A., & Wilkinson, S. (2010). Modernising construction contract drafting – A plea for good sense. Proceedings of the 18th CIB World Building Congress, 323–345.
Anuar Othman, A., Victor Torrance, J., & Hamid, M. A. (2006). Factors influencing the construction time of civil engineering projects in Malaysia. Engineering, Construction and Architectural Management, 13(5), 481–501. https://doi.org/10.1108/09699980610690756
Assaf, S. and Al-Hejji, S. (2005), Causes of delay in large construction projects‟‟. International Journal of Project Management, 24, 349-357.
Bowen, P. ., Cattel, K. ., Hall, K. ., Edwards, P. ., & Pearl, R. . (2012). Perceptions of Time, Cost and Quality Management on Building Projects. Construction Economics and Building, 2(2), 48–56. https://doi.org/10.5130/CEB.v2i2.2900
Bubshait, A. A., & Almohawis, S. A. (1994). Evaluating the general conditions of a construction contract. International Journal of Project Management, 12(3), 133–136. https://doi.org/10.1016/0263-7863(94)90027-2
Cantarelli, C. C., van Wee, B., Molin, E. J. E., & Flyvbjerg, B. (2012). Different cost performance: different determinants? Transport Policy, 22, 88–95. https://doi.org/10.1016/j.tranpol.2012.04.002
Chan, A. P. C., & Chan, A. P. L. (2004). Key performance indicators for measuring construction success. Benchmarking: An International Journal, 11(2), 203–221. https://doi.org/10.1108/14635770410532624
Chan, M. Y. L. (2006). New Engineering Contract ( Nec ) 1993 As Radical Changes To the Malaysian Standard Forms of Contract Borang Pengesahan Status Tesis ♦. Universiti Teknologi Malaysia. Universiti Teknologi Malaysia.
Cheung, S. O., & Yiu, T. W. (2006). Are construction disputes inevitable? IEEE Transactions on Engineering Management, 53(3), 456–470. https://doi.org/10.1109/TEM.2006.877445
Chini, A. R., & Valdez, H. E. (2003). ISO 9000 and the U . S . Construction Industry. Journal of Management in Engineering, 19(2), 69–77.
Cho, K., Hong, T., & Hyun, C. (2009). Effect of project characteristics on project performance in construction projects based on structural equation model. Expert Systems with Applications, 36(7), 10461–10470.
https://doi.org/10.1016/j.eswa.2009.01.032
Chong, H. Y., & Zin, R. M. (2010). A case study into the language structure of construction standard form in Malaysia. International Journal of Project Management, 28(6), 601–608. https://doi.org/10.1016/j.ijproman.2009.09.008
Demirkesen, S., & Ozorhon, B. (2016). Assessing the Impact of Project Characteristics on Construction Project Success. 12th International Congress on Advances in Civil Engineering ACE2016., 1–8.
Doan, P., & Menyah, K. (2013). Impact of Irreversibility and Uncertainty on the Timing of Infrastructure Projects. Journal of Construction Engineering and Management, 139(MARCH), 331–338. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000615.
Doloi, H. (2012). Assessing stakeholders ’ influence on social performance of infrastructure projects. Facilities, 30(11), 531–550. https://doi.org/10.1108/02632771211252351
Elinwa, A.U. and Joshua, A. (2001), “Time-overrun factors in Nigerian construction industry”, Journal of Construction Engineering and Management, Vol. 127 No. 5, pp. 409-25.
Frimpong, Y., Oluwoye, J. and Crawford, L. (2003), “Causes of delay and cost overruns in construction of groundwater projects in developing countries; Ghana as a case study”, International Journal of Project Management, Vol. 21 No. 5, pp. 321-326.
Guo, L., Li, H., Li, P., & Zhang, C. (2016). Transaction costs in construction projects under uncertainty. Kybernetes, 45(6), 866–883. https://doi.org/10.1108/K-10-2014-0206
Hughes, W., Bowen, P., Luis, J., Gomes, C., Chapman, D., Lewis, D., Watson, I. (2002). Construction contract policy : do we mean what we say ? RICS Foundation Research Paper Series, 4(12). Retrieved from www.rics-foundation.org
Idoro, G. (2012). Comparing levels of use of project plans and performance of traditional contract and design‐build construction projects in Nigeria. Journal of Engineering, Design and Technology, 10(1), 7–33. https://doi.org/10.1108/17260531211211863
Iyer, K. C., & Jha, K. N. (2005). Factors affecting cost performance: Evidence from Indian construction projects. International Journal of Project Management, 23(4), 283–295. https://doi.org/10.1016/j.ijproman.2004.10.003
Jaffar, N., Tharim, a. H. A., & Shuib, M. N. (2011). Factors of Conflict in Construction Industry: A Literature Review. Procedia Engineering, 20, 193–202. https://doi.org/10.1016/j.proeng.2011.11.156
Jin, X. H., & Zhang, G. (2011). Modelling optimal risk allocation in PPP projects using artificial neural networks. International Journal of Project Management, 29(5), 591–603. https://doi.org/10.1016/j.ijproman.2010.07.011
Kaming, P.F., Olomolaiye, P.O., Holt,G.D. andHarris, F.C. (1997), “Factors influencing construction time and cost overruns on high-rise projects in Indonesia”, Construction Management and Economics, No. 15, pp. 83-94.
Ling, F. Y. Y., Ke, Y., Kumaraswamy, M. M., Asce, M., & Wang, S. (2013). Key Relational Contracting Practices Affecting Performance of Public Construction Projects in China. Journal of Construction Engineering and Management, 142(March), 1–12. https://doi.org/10.1061/(ASCE)CO.1943-7862
Liu, B., Huo, T., Liang, Y., Sun, Y., & Hu, X. (2012). Key Factors of Project Characteristics Affecting Project Delivery System Decision Making in the Chinese Construction Industry: Case Study Using Chinese Data Based on Rough Set Theory. Journal of Professional Issues in Engineering Education and Practice, 137(January), 206–210. https://doi.org/10.1061/(ASCE)EI
Lo, T. Y., Fung, I. W., & Tung, K. C. (2006). Construction Delays in Hong Kong Civil Engineering Projects. Journal of Construction Engineering and Management, 132(6), 636–649. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:6(636)
Lu, W., Zhang, L., & Zhang, L. (2016). Effect of Contract Completeness on Contractors’ Opportunistic Behavior and the Moderating Role of Interdependence. Journal of Construction Engineering and Management, 142(6), 4016004. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001110
Masrom, M. A. N., Rahim, M. H. I. A., Mohamed, S., Chen, G. K., & Yunus, R. (2015). Successful Criteria for Large Infrastructure Projects in Malaysia. Procedia Engineering, 125(September), 143–149. https://doi.org/10.1016/j.proeng.2015.11.021
Mezher, T.M. and Tawil, W. (1998), “Causes of delay in the construction industry in Lebanon”, Engineering, Construction and Architectural Management, Vol. 5 No. 3, pp. 252-260.
Nasirzadeh, F., Khanzadi, M., & Rezaie, M. (2014). Dynamic modeling of the quantitative risk allocation in construction projects. International Journal of Project Management, 32(3), 442–451. https://doi.org/10.1016/j.ijproman.2013.06.002
Nurul, A. J., Aminah, M. Y., Syuhaida, I., & Chai, C. S. (2016). Public construction projects performance in Malaysia. Journal of Southeast Asian Research, 2016(2016), 1–29. https://doi.org/10.1017/CBO9781107415324.004
Papke-Shields, K. E., Beise, C., & Quan, J. (2010). Do project managers practice what they preach, and does it matter to project success? International Journal of Project Management, 28(7), 650–662. https://doi.org/10.1016/j.ijproman.2009.11.002
Rahmat, I., & Ali, A. S. (2010). The involvement of the key participants in the production of project plans and the planning performance of refurbishment projects. Journal of Building Appraisal, 5(3), 273–288. https://doi.org/10.1057/jba.2009.34
Rameezdeen, R., & Rodrigo, A. (2014). Modifications to standard forms of contract: The impact on readability. Australasian Journal of Construction Economics and Building, 14(2), 31–40.
Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), 517–526. https://doi.org/10.1016/j.ijproman.2006.11.007
Shah Ali, A., Nizam Kamaruzzaman, S., & Salleh, H. (2009). The characteristics of refurbishment projects in Malaysia. Facilities, 27(1/2), 56–65. https://doi.org/10.1108/02632770910923090
Shehu, Z., Endut, I. R., Akintoye, A., & Holt, G. D. (2014). Cost overrun in the Malaysian construction industry projects: A deeper insight. International Journal of Project Management, 32(8), 1471–1480. https://doi.org/10.1016/j.ijproman.2014.04.004
Songer, A. D., & Molenaar, K. R. (1997). Project Characteristics for Successful Public-Sector Design-Build. Journal of Construction Engineering and Management, 123(1), 34–40. https://doi.org/10.1061/(ASCE)0733-9364(1997)123:1(34)
Takim, R., & Akintoye, A. (2002). Performance Indicators for Successful Construction Project Performance. Association of Researchers in Construction Management, 2(September), 2–4. https://doi.org/10.1017/CBO9781107415324.004
Toor, S., & Ogunlana, S. O. (2009). Construction professionals’ perception of critical success factors for large‐scale construction projects. Construction Innovation, 9(2), 149–167. https://doi.org/10.1108/14714170910950803
Verweij, S., van Meerkerk, I., & Korthagen, I. a. (2015). Reasons for contract changes in implementing Dutch transportation infrastructure projects: An empirical exploration. Transport Policy, 37, 195–202. https://doi.org/10.1016/j.tranpol.2014.11.004
Wright, J. N., & Fergusson, W. (2009). Benefits of the NEC ECC form of contract: A New Zealand case study. International Journal of Project Management, 27(3), 243–249. https://doi.org/10.1016/j.ijproman.2008.03.005
Yao, H., Shen, L., Tan, Y., & Hao, J. (2011). Simulating the impacts of policy scenarios on the sustainability performance of infrastructure projects. Automation in Construction, 20(8), 1060–1069. https://doi.org/10.1016/j.autcon.2011.04.007
Zhang, L., & Fan, W. (2013). Improving performance of construction projects. Engineering, Construction and Architectural Management, 20(2), 195–207. https://doi.org/10.1108/09699981311303044
Refbacks
- There are currently no refbacks.