SYSTEM PATHOGENS INHIBITING CONSTRUCTION PROJECT RISK MANAGEMENT PERFORMANCE: DELIBERATE IGNORANCE PERSPECTIVE

Samuel Bassey Ekung

Abstract


Risks have emerged as one of the most significant project management concerns due to their effects on construction project performance. Several literature attributes the increasing consequences of risks to low awareness and ineffective management practices. This paper draws attention to the existence of latent pathogens affecting the efficiency of risk management performance (RMP). The objective was to determine whether construction stakeholders’ ‘deliberate ignorance’ of inherent risk management pathogens classified as complexity, complicatedness, mindlessness, and project pathologies affects RMP. A survey questionnaire administered to 135 certified construction project managers in Nigeria provided the data used for the study. Data analysis engaged descriptive statistics and Fuzzy Set Theory. The result revealed that ineffective RMP arise mainly from factors related to project complexity and mindlessness. Complexity increases project uncertainty without appropriate tools to address them; while the criticality of the relationships between risks elements continuously vary in practice. Mindlessness depicts stakeholders’ ‘wilful ignorance’, biased perception, and mind-set towards risk management. The results suggest that reducing project complexity, biased perceptions and improving stakeholders’ capacity would benefit RMP. Therefore, improving the capacity of stakeholders and developing appropriate tools to address the changing nature of risks are areas to improve RMP.


Keywords


Construction industry, construction projects, system pathogens, risk management, risk management performance.

Full Text:

PDF

References


Adeleke, A. Q.; Bahaudin, A. Y.; and Kamaruddeen, A. M. (2015). Level of Risk Management Practice in Nigeria Construction Industry – from Knowledge Based Approach, Journal of Management Marketing and Logistics, 2(1), 12-23.

Akintoye, A. S. and MacLeod, M. J. (1997). Risk Analysis and Management in Construction, International Journal of Project Management, 15(1), 31-8.

Al-Zarooni, S. and Abdou, A. (2000). Risk Management in Pre-Design Stage and its Potential Benefits for UAE Public Projects. In, 28th World Congress on Housing Challenges for the 21st Century, 15-19 April, Abu Dhabi, UAE, 109-18.

Amadi, A. and Higham, A. (2016). Geotechnical Characterisation of Cost Overrun Drivers in Highway Projects: Predicted on Heterogeneous Ground Conditions in the Niger Delta Region of Nigeria. In: P. W. Chan and C. J. Neilson (Eds) Proceedings of the 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK, ARCOM, Vol 1, 311-320.

Amadi, A. and Omotayo, T. (2017). The Nomenclature of Geotechnical Error Traps as a Theoretical Framework for Assessing Financial Risks in Transportation Infrastructure Projects. InProceeding of 13th International Postgraduate Research Conference 2017, 14-15 September, 2017, University of Salford, Manchester, 403-413.

Amade, B.; Akpan, E.O.P.; Ukwuoma, F. P. O. and Alaijemba, C.C. (2014). Project Cost Contingency in the

Nigerian Construction Industry, Journal of Research in Management and Technology, 2(2), 9-21.

Azman, M.A.; Abdul-Samad and Ismail, S. (2013). The Accuracy of Preliminary Cost Estimates in Public Works Department (PWD) of Peninsular Malaysia, International Journal of Project Management, 31, 994-1005.

Beck, U. (1992). Risk Society: Towards a New Modernity. New York: Sage.

Bedford, D. and Cook, J. (2013). Agnotology, Scientific Consensus, and the Teaching and Learning of Climate Change: A Response to Legates, Soon and Brigges, Science and Education, 22(8), 2019-2030

Busby, J. S. and Zhang, H. (2008). The Pathogen Construct in Risk Analysis, Project Management

Journal, 39(3), 86-96.

Ekung, S. and Adu, E. (2018). Limitations of Risk Identification Tools Applied in Project Management in the Nigerian Construction Industry, Journal of Advanced Research in Construction and Urban Architecture, 3(3), 34-43.

Ejohwomu, I. J. (2014). A Study of Risk Management Practices in the Construction Industry, MSc Thesis submitted to the University of Wolverhampton.

Elfaki, A.O. and Alatawi, S. (2015). Representing the Knowledge of Public Construction Project Cost Estimator by Using Rule-Based Method. Journal of Building Construction and Planning Research, 3, 189-195, http://dx.doi.org/10.4236/jbcpr.2015.34019.

Atasoy, G. (2007). Using Cognitive Maps for Risk Modelling in Construction Projects Success, a Thesis Submitted to Middle East Technical University

Hillson D. (2003). Risk Management: Best Practice and Future Developments, Presented at II Congreso Nacional de Gerencia deProyectos, Universidad de Ingeneria, Lima Peru, 24-25 October 2003.

Farrokshand, M.; Chan, P. W. Blackwell, P. (2016). Opening up Risk Management through Gofffman’s Dramatugical Approach. In: P. W. Chan and C. J. Neilson (Eds) Proceedings of the 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK, ARCOM, Vol 1, 237-246.

Laryea, S and Hughes, W (2008). How Contractors Price Risk in Bids: Theory And Practice, Construction Management and Economics, 26(9), 911-924.

Laryea, S. and Hughes, W. (2009). How Contractors in Ghana include Risk in their Bid Prices. In: Dainty, A. (Ed) Procs 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK, Association of Researchers in Construction Management, 1295-1304.

Love, P.; Edwards, D. and Iran, Z. (2012). Moving Beyond Optimism Bias and Strategic Misrepresentation: An Explanation for Social Infrastructure Project Cost Overrun, IEEE Transaction on Engineering Management, 59(4), 571-590

Joustra, S. B. (2009). Towards the Effective Management of Risk in Complex Projects: a Case Study Review, International Journal of Project Management, 29, 001-014.

Jensen, C. (2014). Risk Analysis and Management for Projects (RAMP), 2nd edition, Institution of Civil Engineers and the Actuarial Profession. London: Thomas Telford Ltd; 2014.

Kleffner, A. and Campbell, G. (2012). The Organisational Barriers to Preventing Catastrophes by Risk Management, Magazine, 2012.

Kotb, M. H. and Ghattas, M. M. (2017). An Overview of Risk Identification Barriers with Implementation of PMI Standards in Construction Projects, PM World Journal, VI(X), 1-12.

Kutch, E. and Hall, M. (2010). Deliberate Ignorance in Project Risk Management, International Journal of Project Management, 28, 245-255.

Maina, N. P.; Mbabazize, M.; and Kibachia, J. (2016). Evaluation of Factors Affecting Effectiveness of Risk Management in Public Housing Construction Projects in Rwanda: Case of Batsinda Housing Project, European Journal of Business and Social Sciences, 5(1), 85-101

Manning, P. K. (2008). Goffman on Organisation, Organisation Studies, 29(5), 677-699.

Mir, F., and Pinnington, A. (2014). Exploring the Value of Project Management: Linking Project Management Performance and Project Success, International Journal of Project Management, 32, 202–217.

Nnadi, E. E. and Ugwu, O. O. (2013). An Appraisal of Risk Management in Nigeria Construction Industry, International Journal of Research and Advancement in Engineering Science, 3(2), 41-50

Osipova, E. and Eriksson, P. E. (2013). Balancing Control and Flexibility in Joint Risk Management: Lessons Learned from two Construction Projects, International Journal of Project Management, 31(3), 391-399.

Otali, M., and Odesola, I. (2014). Effectiveness Evaluation of Contingency Sum as a Risk Management Tool for Construction Projects in Niger Delta, Nigeria, Ethiopian Journal of Environmental Studies and Management, 7(6): 588 – 598.

Shen, L.; Lu, W.; Peng, Y. and Jiang, S. (2012). Critical Assessment Indicators for Measuring Benefits of Rural Infrastructure Investment in China, Journal of Infrastructure Systems, 17(4), 176– 183.

Shi, Q.; Liu, Y.; Zuo, J.; Pan, N.; and Ma, G. (2015). On the Management of Social Risks of Hydraulic Infrastructure Projects in China: A Case Study, International Journal of Project Management, 33(3), 483-496.

Stalker, K (2003). Managing Risk and Uncertainty in Social Work: a Literature Review, Journal of

Social Work, 3(2), 211-233.

Ramasesh, R. V. and Browning, T. R. (2014). A Conceptual Framework for Tackling Knowable Unknowns Unknowns in Project Management, Journal of Operational Management, pre-press version obtained from https://www.researchgate.net/publication/261029536, retrieved 23/09/2017. DOI: 10.1016/j.jom.2014.03.003

Teller, J, Kock, A. and Gemünden, H. G. (2014). Risk Management in Project Portfolios is more than Managing Project Risks: A Contingency Perspective on Risk Management, Project Management Journal, 45(4), 67-80.

Tsiga, Z., Emes, M., and Smith, A. (2016). Attitudes to risk in petroleum projects. International Conference on Project Management, 100, 305 – 312.

Tsiga, Z., Emes, M., and Smith, A. (2017). Attitude and Personality towards Risk Management in the Construction Industry, second edition, PM World Journal, VI(X), 1-11.

Van Os, A. Van Berkel, F, De Gilder, D, Van Dyck, C and Groenewegen, P. (2015). Project Risk as Identity Threat: Explaining the Development and Consequences of Risk Discourse in an Infrastructure Project, International Journal of Project Management, 33(4), 877-888.

Wood, G.D. and Ellis, R.C.T. (2003). Risk Management Practices of Leading UK Consultants. Engineering, Construction, and Architectural Management, 10(4), 254-262.

Yauger, V. (2017). When Risk Management Meets Risks Realised: Mitigating Project Impact, PM World Journal, VI(X), 1-13.

Yudollahi, M.; Mirghasemi, M.; Zin, R. M. and Singh, B. (2014). Architect Critical Challenges as a Project Manager in Construction Projects: A Case Study, Advances in Civil Engineering, 2014, 1-16, doi.org/10.1155/2014/205310.

Zhang, H. (2011). Two Schools of Risk Analysis: A Review of Past Research on Project Risk, Project Management Journal, 42(4), 5-18.


Refbacks

  • There are currently no refbacks.